Opens in a new tab

Full Council

Meeting Summary

Meeting Agenda

Dear Councillor

You are hereby summoned to attend a meeting of the St Goran Parish Council on Thursday 1st October 2026, The Old School Rooms at 7.30pm.

 

If you wish to attend, please register with the Clerk and please submit questions/comments prior to the meeting via email

 

Members of the public are invited to attend as there will be the usual adjournment at the start of the meeting to allow members of the public present who are residents in the Parish to express their views on any subject.

This meeting is audio-recorded solely to assist minute preparation. For those who do not wish to speak, written representations are permissible.

Signed:                                                Date: 25th September 2026
AGENDA
1/10/26   Apologies

2/10/26 (a) Declarations of Interest

             (b) Gift Declarations

             (c) Consideration of Written Requests for Dispensations

3/10/26 Public Session

4/10/26 Minutes of the Council Meeting of 3rd September 2026

5/10/26 Matters Arising

     5.1/10/26 Seaweed Removal Policy

     5.2/10/26 Standing Orders

     5.3/10/26 Traffic Regulation Order – Restricted Parking Canton Street

     5.4/10/26 Use of Cemetery Outbuilding

5.5/10/26 Community Fund – Thank You

5.6/10/26 Planning Committee Reform: New Protocols

     5.7/10/26 Any Further Matters Arising Prior to Meeting

6/10/26 Committee Reports

     6.1/10/26 Footpaths

 6.2/10/26 Beach – Kayak Business Proposal

6.3/10/26 General Purposes (Cemetery, Gorran Green)

6.4/10/26 Public Convenience

     6.5/10/26 Roadworks

     6.6/10/26 Neighbourhood Development Plan

6.7/10/26 Kemeneth Carvinick

7/10/26 Cornwall Councillor Comments
8/10/26 Correspondence

     8.1/10/26 CALC – AGM

8.2/10/26 Member of the Public – Glass fronted Noticeboard

8.3/10/26 Gorran Haven Big Cellars and Fisherman’s Loft Owners – Condition

of Beach Access

8.4/10/26 CALC – Weed and Public Realm Management Update

8.5/10/26 CALC – Register of Interests Publication

     8.6/10/26 Newsletters

     8.7/10/26 Any further correspondence received prior to the meeting –

Information only

9/10/26 Planning Matters

PA26/04800: Mr and Mrs Drew, Pothy’s Place, Church Street Listed Building

Consent for replacement of the mains cold-water supply to the property and

three existing roof windows

Listed Building Consent         https://h1.nu/1xoXr

PA26/05906:Caerhays Estate, Tregavarras Farm Cottage Internal & external

repair & refurbishment

Full Application               https://h1.nu/1ynmw

PA26/05907:Caerhays Estate, Tregavarras Farm Cottage Listed building

consent for Internal & external repair & refurbishment

Listed Building Consent   https://h1.nu/1E9PK

PA26/06248: Catherine Longley, Penarwyn, Rice Lane Application for tree

works within a TPO area: Tree 2 – Blackthorn tree to be removed Tree 3 –

Hawthorn tree to be removed Tree 4 – Hawthorn tree to be pruned from

current height of approx 6 metres to 2 metres.

Tree Preservation Order     https://h1.nu/1ynl-

PA26/06431: Mr and Mrs J Burrows, 23 Trelispen Park Drive Proposed rear

extension and replacement side extension

Full Application                  https://h1.nu/1yLqz

PA26/06450: Mrs Linda Smith, Kerria Cottage, Rice Lane Works to Tree

covered by a Tree Preservation Order (TPO) – Ash – Reduce crown by 20-25%

Tree Preservation Order     https://h1.nu/1EAcc

Any Further Applications Received Prior to Meeting

9.1/10/26 Cornwall Council Planning Decisions

9.2/10/26 Appeal Decision – PA25/00620

 10/10/26 Bills for Payment & Budget Review

 11/10/26 Internal Accounts Inspection & Bank Reconciliation Verification

 12/10/26 Armistice Service Arrangements

 13/10/26 Parish Problems
 Exclusion of the Public and Press

Under Section 1(2) of the Public Bodies (Admission to Meetings) Act 1960, it

is proposed that because of the confidential nature of the business to be

transacted, the public and press be excluded from the meeting for agenda

items. 14/10/26

14/10/26 Outbuilding Removal – Tenders

_____________________________________________________________________

Chairman                                         Clerk

Mr Darren Male                                    Mrs Lesley Pothecary

Darren.male@stgoran-pc.gov.uk           Correspondence address only –

Farleigh, Gorran, St Austell, Cornwall

PL26 6HW

07888817809 clerk@stgoran-pc.gov.uk

Date of the next full meeting of the Council: Thursday 5th November 2026

 

Download Agenda  (147 KB)

Meeting Minutes

MINUTES OF A MEETING of the St Goran Parish Council held on 1st October 2026 in the Old School Rooms at 7.30pm, with Mr D Male in the Chair.

Present were Messrs Ayres, Blamey, Enos, Grose, Lobb, Mitchley, Smith, Dr Dunne, Mrs Rylatt, Cornwall Councillor German, and 1 member of the public.

 

1/10/26 APOLOGIES

None

 

2(a)/10/26 DECLARATIONS OF INTEREST

Mr Lobb – 5.3/10/26

 

2(b)/10/26 GIFT DECLARATIONS

None

 

2(c)/10/26 CONSIDERATION OF WRITTEN REQUESTS FOR DISPENSATION.

None

 

3/10/26 PUBLIC SESSION

A member of the public asked if the back of Gorran Green can be strimmed and asked Cornwall Councillor German whether the CC ditch by the Green can be cleared.

 

The meeting then went into the formal session.

 

4/10/26 MINUTES OF THE MEETING OF THE  3RD SEPTEMBER 2026

An amendment to item 13/09/26 – part of the road is beginning to subside. Replaced with – part of the road is beginning to subside on the access road to Galowras Mill. It was then proposed, seconded and RESOLVED to accept the minutes.

 

5/10/26 MATTERS ARISING FROM THE MINUTES

 

5.1/10/26 Seaweed Removal Policy

It was suggested that a seaweed removal procedure should  be written. Dr Dunne agreed to write a procedure and present at the next meeting.

 

5.2/10/26 Standing Orders

The Chairman had edited the latest edition of the NALC model standing orders to suit the PC’s requirements. A copy was sent to all Councillors for their approval.

It was proposed, seconded and RESOLVED to adopt the edited version of the standing orders.

There was also discussion regarding the introduction of the new google.docs system of editing documents. The Standing Orders had been circulated on google.docs to all councillors who were on email. This system allows all council members to edit documents and view the edits of others. The Clerk was finding this system very useful. The Vice Chair offered to train any councillors who wished to learn how to use it more effectively.

 

5.3/10/26 Traffic Regulation Order – Restricted Parking Canton Street

The derestriction of the double yellow lines between the Chapel and the Chop Shop was discussed. Cornwall Councillor German reported a regulation order would cost £6k and could be used for a number of highways changes within the Parish. It was suggested to revisit the matter when the next Community Highways Improvement Programme is released in April 2027.

Current suggestions are:

-Derestrict the double yellow lines on Canton (between the Chapel & Chop Shop).

-Disabled parking space on Canton (outside toilets)

-Implement parking restrictions on the triangle.

 

5.4/10/26 Use of Cemetery Outbuilding

Prior to the meeting, and following consultation with all Councillors, the Clerk, acting under delegated authority, authorised the SGCI group to strim around the outbuilding, to allow them to assess any repairs that might be required. They were prohibited from entering the building due to its derelict state.

 

5.5/10/26 Community Fund

The PCC thanked the PC for the grant towards the Parish Nurse. A new parish nurse has been appointed and is at present on a training course with Parish Nursing Ministries UK

 

5.6/10/26 Planning Committee Reform: New Protocols Cornwall Council

Mr Mitchley presented the new planning reforms to the PC.

Cornwall needs to build 4,400 new homes a year and the new protocols aim to bring about faster, clearer and more consistent decisions.

There will be a national scheme of delegation and Committees will be capped at 13 members. It will affect what comes to committee and how referrals work. From 31st October 2026

National delegation is split into two schedules:

Schedule 1: Officer ONLY decisions which may not go to committee

Schedule 2: Usually, officer decisions but may go to committee if Gateway Test met

The way parish and town councils are consulted will not change.

The 5 day notice period is valued by stakeholders and will be kept.

All planning decisions will devolve from Cornwall Council’s Local Plan.

Officers will have a much greater say in planning decisions and some types will be prevented from going to committee.

The effects of the new protocols were discussed by all Councillors. It was suggested that the PC may feel the pressure of CC’s need to build more homes. Cornwall Councillor German report that St Goran Parish is covered by the National Landscape Plan that protects against larger scale developments and social housing is more acceptable in the National Landscape Plan rather than a development of luxury homes. Mr Smith reported that he is employed by a company whose sole aim is to alleviate homelessness, through social housing.

 

6/10/26 COMMITTEE REPORTS.

 

6.1/10/26 Footpaths

The materials for footpath No 7 have been delivered.

Stile access on footpaths No 13 & 14 to be reported to the contractor.

 

6.2/10/26 Beach

The repairs to the Quay have begun.

Mr Ayres was thanked for painting the seats on the Platt.

 

6.3/10/26 General Purposes

Gorran Green

A vehicle had flattened a ‘road narrows’ sign by the phone box and damaged the salt bin.

It was proposed, seconded and RESOLVED to request the maintenance contractor to remove the damaged salt bin and for a replacement to be ordered from Cormac paid for by the PC.

The drain by the phone box has been cleared but the resulting hole needs to be safety guarded. This is to be made good by CC.

It was proposed, seconded and RESOLVED to request the grass cutting contractor to strim the back of Gorran Green.

 

6.4/10/26 Public Convenience

The current building is not suitable for successful grant applications and the surrounding ground needs to be community friendly. The committee is of the opinion that the toilet block requires demolishing and rebuilding due to fundamental issues with the building itself. With the toilets being the largest expense for the PC, it was suggested to charge for the use of the toilets once redeveloped to make them more financially sustainable, in line with other public toilets around the county. It was also suggested that they can be automatically locked at set times to help prevent repeated vandalism which occurred late at night.

Mr Lobb presented a plan for the new toilet block. It was proposed, seconded and RESOLVED to accept the plan that includes 4 toilets, plus a separate disabled toilet, and a service/store cupboard.

Mr Ayres abstained.

To progress the project, planning and building regulations are required.

It was proposed, seconded and RESOLVED to authorise the committee to spend £3440 on planning permission and building regulations.

Mr Ayres abstained.

 

 

6.5/10/26 Roadworks

Approved closure – Tucoyse Hill, Polmassick, St Austell, 12th October 2026 to 16th October 2026 (24 hours)

Approved closure- Chute Lane, Gorran Haven, 14th October 2026  (09:30 to 15:30 hours)

Intention notice – Road From Junction East Of Pengrugla To B3273 At Junction South Of Tregiskey Farm, Pentewan, St Austell, 26th October 2026 (09:30 to 15:30 hours)

Intention Notice – Chute Lane, Gorran Haven, 30th November 2026 to 2nd December 2026 (08:00 to 18:00 hours)

Intention Notice – Cliff Road, Gorran Haven, 7th December 2026 to 9th December 2026 (24 hours)

Intention Notice – Lamledra Hill, Gorran Haven, 13th January 2027 (08:00 to 18:00 hours)

 

6.6/10/26 NDP

The NDP are currently responding to parishioners’ comments on the draft plan.

It was proposed, seconded and RESOLVED to add Housing to the NDP section of the agenda.

 

6.7/10/26 Kemeneth Carvinick

Nothing to report

 

7/10/26 CORNWALL COUNCILLOR COMMENTS

Cornwall Council German explained CC current financial position. Following an overspend of £17 million in quarter 1, costs controls have been implemented. He reported that the CC’s part of the council tax is most likely to rise by 5% and could subsequently affect the PC’s precept due to the financial burden already placed by CC.

 

8/10/26 CORRESPONDENCE

 

8.1/10/26 CALC – AGM

The CALC AGM will take place at the Royal Cornwall Showground, Wadebridge on Tuesday 6th October at 9:30am.

 

8.2/10/26 Member of the Public – Glass Fronted Noticeboard

A member of the public is still happy to look after the noticeboard by Gorran Stores and suggests that it is revarnished.

It was proposed, seconded and RESOLVED to request the maintenance contractor to revarnish both glass fronted noticeboards (the one by Gorran stores and the one in Gorran Haven near the toilets), with an expenditure limit of £200.

 

8.3/10/26 Gorran Haven Big Cellars and Fisherman’s Loft Owners – Condition of Beach Access

At a recent meeting held on the 5th September this year, concern was raised, regarding the drop caused by the rerouting of the stream since work had been undertaken by contractors a while ago, which resulted in occasional severe erosion of the sand, making launching of boats and disabled access difficult.

 

The PC had previously considered this matter and commissioned a survey from disability Cornwall in November 2021. The trip hazard caused by the protruding bollard sockets, located on the slipway had been removed.

 

A beach risk assessment has been commissioned and will be finalised in the November meeting.

 

8.4/10/26 CALC – Weed and Public Realm Management Update

Earlier this year many CALC member councils raised concerns about Cornwall Council’s weed management approach and future public realm arrangements.

Following a successful Public Realm Working Group held at County Hall in August, Cornwall Council officers have confirmed that positive progress is being made on two key areas.

  1. 2026/27 Hotspot Prioritisation Programme. Local Councils will shortly be invited to identify and rank weed-management hotspots.
  2. Service Level Agreements from 2027/28. There is continuing discussion around the potential development of a two-year Service Level Agreement (SLA) style arrangement for public realm services from 2027 onwards.

 

8.5/10/26 CALC – Register of Interests Publication

Following feedback from a number of councils regarding the publication and accessibility of Registers of Interests (ROIs), CALC has raised these concerns directly with Cornwall Council’s Monitoring Officer service. Principal authorities are responsible for maintaining and publishing Parish and Town Councillor Registers of Interests and Local Councils are not required to maintain their own separate statutory repository. Following the 2025 elections and subsequent refresh of declarations, a number of councils reported difficulties locating published forms, delays in publication, and concerns about the overall accessibility of the system.

CALC has made it clear to Cornwall Council that their preferred approach remains:

A single, authoritative repository maintained by Cornwall Council. Information that is easy for the public to find and search. Registers published promptly and consistently.

One single email address to send ROIs. No requirement for councils to duplicate the information on their own websites. Cornwall Council advised that there is currently no backlog of ROI forms awaiting publication and the current arrangements will remain in place.

 

9/10/26 PLANNING MATTERS

 

PA26/04800: Mr and Mrs Drew, Pothy’s Place, Church Street Listed Building Consent for replacement of the mains cold-water supply to the property and three existing roof windows

Listed Building Consent         https://h1.nu/1xoXr

It was proposed, seconded and RESOLVED to support.

 

PA26/05906:Caerhays Estate, Tregavarras Farm Cottage Internal & external repair & refurbishment

Full Application               https://h1.nu/1ynmw

It was proposed, seconded and RESOLVED to support.

 

PA26/05907:Caerhays Estate, Tregavarras Farm Cottage Listed building consent for Internal & external repair & refurbishment

Listed Building Consent   https://h1.nu/1E9PK

It was proposed, seconded and RESOLVED to support.

 

PA26/06248: Catherine Longley, Penarwyn, Rice Lane Application for tree works within a TPO area: Tree 2 – Blackthorn tree to be removed Tree 3 – Hawthorn tree to be removed Tree 4 – Hawthorn tree to be pruned from current height of approx 6 metres to 2 metres.

Tree Preservation Order     https://h1.nu/1ynl-

It was proposed, seconded and RESOLVED to support.

 

PA26/06431: Mr and Mrs J Burrows, 23 Trelispen Park Drive Proposed rear extension and replacement side extension

Full Application                  https://h1.nu/1yLqz

The PC are unable to consider this application in its current form because it is lacking in detail and includes out of date images. The PC cannot ascertain from the plans whether there is suitable screening from adjacent properties.

The Chairman and Mr Lobb abstained.

 

PA26/06450: Mrs Linda Smith, Kerria Cottage, Rice Lane Works to Tree covered by a Tree Preservation Order (TPO) – Ash – Reduce crown by 20-25%

Tree Preservation Order     https://h1.nu/1EAcc

It was proposed, seconded and RESOLVED to support

 

9.1/10/26 Cornwall Council Planning Decision

 

PA26/03067: Merrick Trustees of Caerhays Estate, Land South West Of Blacksmiths Shop Gorran St Austell                                                                                      APPROVED

PA26/05230: Lara Goodlad, 3 Trelispen Park                                            APPROVED

 

9.2/10/26 Appeal Decision – PA25/00620               The Appeal is dismissed

 

10/10/26 BILLS FOR PAYMENT & BUDGET  REVIEW     

PAYMENTS                                                    RECEIPTS

NEST           Pension payment £24.57   HSBC   Community Fund interest         £1.73

Google Website £84.00                          Cornwall Council2nd 1/2 Precept £25,250.00

Pennon Water Water Supply    £652.40 Defra  Beach signage grant               £390.00

British Gas  Electricity supply     £85.92  Member of the Public Toilet donation £10.00

ID Mobile Parish Telephone         £8.40  Members of the public Toilet boxes   £520.00

St Goran PCC Parish Nurse grant £1,100.00   HSBC Toilet fund interest            £0.05

Mr RL Storey Beach bollards     £225.00 Member of PublicToilet refurb          £150.00

Duchy Cemeteries  Burial Preparation £100.00

CI Electrical Gents light               £433.85

Mrs L Pothecary Clerks Purchases £20.69

Mrs L PothecaryClerks Salary      £940.04

Mrs L Pothecary Clerks Expenses £98.75

AJH Cleaning Services Toilet cleaning £5,375.41

The Habitat Restoration Co Ltd LMP £1,470.00

The Habitat Restoration Co Ltd SWCP £1,617.60

S Spence         Grasscutting                     £215.00                                                                                            TOTAL   £12,451.81                TOTAL £26,321.78

All the Bills for August have been paid. It was proposed, seconded and RESOLVED to pay the bills for September. A copy of the accounts was sent to all Councillors. The Clerk presented the actual receipts and payments to date, which were compared with the yearly budget.

Quotes will be required for any ad hoc works.

 

11/10/26 Internal Accounts Inspection and Bank Reconciliation Verification.

The internal control check was completed by Mr Enos.

Mr Enos felt that the frequency of the internal control inspection was excessive, due to the majority of the actions occurring on an annual basis.

It was proposed, seconded and RESOLVED to consult with the PC’s internal auditor.

 

The bank reconciliation was verified and accepted by Mr Enos.

 

12/10/26 Armistice Service Arrangements

It was proposed, seconded and RESOLVED for Mr Lobb to lay a wreath this year and for the PC o donate £80 to the Poppy Appeal.

 

13/10/26 Parish Problems

Cornwall Councillor German was thanked for Chute Lane being marked up for repair works. He was also asked about the state of the road surface along Portheast Way.

 

The meeting closed at 9.45pm

Download Minutes  (135 KB)